­ˇ˝˝ŕŔÚ

Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014)

Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014) Don River bridge on M-4 źDon╗ Highway (Aksai, Rostov region, 2014)

“Full-cycle” contract.

Reconstruction, maintenance and rehabilitation of a bridge crossing over the Don River at km 1061 – km 569 (left side) of M-4 Don Highway.

The reconstruction project includes complete disassembly of the existing structures of the left Aksai Bridge and construction in its place of a modern bridge.

The total length of the new bridge crossing will be 1,227.7 m including a three-lane one-way bridge with the length of 567.11 m.

Preparatory stages and reconstruction are scheduled for completion in September 2014 with post-construction maintenance until July 2029.