русский

The Bor alternate bridge in Nizhny Novgorod (2017)

The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017) The Bor alternate bridge in Nizhny Novgorod (2017)
Project Profile:
  • 1.5 km two-way bridge across the Volga;
  • right- and left-bank approaches with a total length of 7.3 km (including expanding the highway to Tolokonstevo to four lanes);
  • two 80-metre floodplain bridges and a 79.3-metre bridge across the Vezloma River (on the left tributary of the Volga);

  • duplex traffic interchange in the Neklyudovo village including a new viaduct with a total length of 339 m;

  • two duplex and one single-level interchanges and two pedestrian overpasses.
Project Specificities:
  • The new bridge runs parallel to the existing road-rail bridge;
  • Traffic has not been affected by construction works and is running as normal.