Angara River bridge (Irkutsk)

Parameters:

  • In-situ pre-stressed reinforced concrete bridge;
  • Length — 1,615m, width — 32m.

Challenge:

  • Construction work was conducted in harsh climate conditions;
  • For the first time in Russia 105 meter add-on concreting was used.

Back to the list