The interchange has been reconstructed and the M-5 "Ural" Highway extended to 8 lanes, each 3.75m wide.
The reconstruction work included building 4 and reconstructing 2 flyovers with a total length of 672m, and building right-hand and left-hand additional access roads, installing 5 car stops, 4m-high noise barriers, road signs and safety barriers and water drainage systems.
The total length of access roads built is more than 5km.